Website Development in Moldova: Types, Stages and What Drives the Price
Website development in Chisinau and Moldova: types of websites, project stages and what the price depends on. From €500, free project assessment.
2026-11-02
When a company searches for website development in Moldova or Chisinau, the real question is usually a different one: what kind of website it needs, how long it will take and how much it will cost. The answer depends on your goals, the scope and the systems the website has to work with. Below you will find the main types of websites, the stages of a project, the factors that shape the price and a checklist for choosing a development team in Chisinau.
What kind of website do you need
The type of website defines the structure, the functionality and ultimately the budget. For companies in Moldova, the most common formats are:
- Presentation website — a few pages about the company, services and contacts, with an inquiry form. A good fit when the main goal is to be found and contacted.
- Corporate website — a broader structure: business lines, sections for clients and partners, forms that pass leads straight into your CRM.
- Landing page — a single page for an offer, a campaign or a service, built for conversion.
- Online store or catalog — products, filters, shopping cart and orders. Here it matters that prices and availability are up to date.
- Website integrated with ERP/CRM — catalog, availability, orders or inquiries are synchronized with your system of record via APIs, webhooks or agreed exchange formats.
If stock levels and prices are updated by hand, the website soon shows something different from the warehouse. We covered the consequences of that gap in The Cost of a Bad Website, and we describe connecting a website to the accounting system on the 1C implementation and integration page.
Stages of building a website
A predictable project goes through the same stages regardless of the type of site. Only the scope of each stage changes.
1. Brief and discovery
Goals, audience, site type, systems to integrate (ERP, CRM), constraints and risks are clarified. At AKDEV the project assessment is free, and we give you the timeline and budget before we start.
2. Structure and architecture
Pages, navigation and information architecture are defined. For projects with integrations, so are the integration boundaries: which data comes from the ERP or CRM, how often, and what happens if an exchange fails.
3. Design and UX
The interface is built on the agreed structure: how visitors find information, fill in a form and get to an order. Many people search for “web design Moldova”, but appearance is only part of the result: a good-looking site that is slow or shows outdated data does not bring in customers. How custom the design is also affects the cost.
4. Development
Iterative implementation with quality gates and validation on a staging environment, including real integration paths to the ERP.
5. Content
Copy, photos, product data. Content readiness directly affects the timeline: a technically finished site cannot go live without content.
6. SEO and performance
Page structure, metadata and speed (Core Web Vitals) are part of delivery, not an afterthought. The structure is ready for indexing from the first release.
7. Launch
Performance, SEO and security checks before go-live, launch with a rollback plan, then monitoring and post-launch adjustments.
8. Support and further development
After launch, a website needs updates, fixes and new features. Work continues from an agreed backlog, and the engagement format, including SLAs, is agreed with the client.
Website development: what the price depends on
At AKDEV, website development starts from €500. The final cost is estimated per project and depends on a few concrete factors:
- Number of pages — a presentation site with a few pages and a corporate site with dozens of sections need different amounts of structure, implementation and testing.
- Functionality — catalog, shopping cart, forms, customer accounts. Each adds logic, validation and test scenarios.
- Number of languages — you decide whether the site will be in Romanian, Russian, English or a combination. Each additional language means extra content, metadata and checks.
- Integrations — synchronization with ERP/CRM or other systems is usually the most complex part: data formats, error handling, monitoring.
- Design and content — how custom the design is and how ready the copy, photos and product data are.
Timelines follow the same logic. A corporate presentation site takes 4–8 weeks; a site with ERP integration or complex functionality takes 2–4 months. The exact timeline is set after discovery and included in the proposal together with the budget — no hidden costs.
For a concrete estimate, briefly describe your project on the website development in Chisinau page or call +373 68 733 331.
How to choose a website development team in Chisinau
A low price at the start does not guarantee a low-cost project at the end. Before you sign, check:
- A real portfolio — live websites you can open and test, not just screenshots.
- A written proposal with budget and timeline — after discovery, with a clearly described scope.
- Integration experience — if you run an ERP or CRM, ask how data is synchronized and what happens when an exchange fails.
- SEO and performance as part of delivery — page structure, metadata, speed, not “we will do it after launch”.
- A transparent process — staging environment, demos, sign-off on each stage.
- Documentation and handover — access, code and instructions stay with you, so your own team or another vendor can operate the site.
- Post-launch support — who responds when something breaks, and in what format.
- Local communication — a team in Chisinau, in your time zone, with meetings online or in person by agreement.
The AKDEV team also takes over projects started by others: a short audit, a stabilization plan, then incremental delivery until the site runs reliably in production.
Websites built by AKDEV
A few projects you can open right now:
- foc.md — Felicia Optic Center, website for an optical store chain (eyeglasses and sunglasses) in Chisinau.
- ambalajmarket.md — Ambalaj Market, HoReCa online store with 1,000+ products.
- radupromo.md — Radu Promo, catalogue of motorcycles, bicycles, tractors and spare parts.
- parad.md — Parad, fashion online store for women and men.
Next step
If you are planning a new website or want to rebuild an existing one, start with a short conversation about goals, site type and integrations. We assess your project for free and give you a timeline and budget before we start. Details and the “Get a quote” form are on the website development in Chisinau and Moldova page. You can also reach us via the contact page or call +373 68 733 331.
FAQ
How much does a website cost in Moldova?
At AKDEV, prices start from €500. The final cost depends on the number of pages, functionality, number of languages, integrations and content. After discovery you get a clear proposal with budget and timeline — no hidden costs.
How long does it take to build a website?
Corporate presentation site: 4–8 weeks. With ERP integration or complex functionality: 2–4 months. The exact timeline is set during discovery and included in the proposal.
Can you integrate the website with 1C, another ERP or a CRM?
Yes. We design integrations so the site reflects data from your system of record — catalog, availability, orders or inquiries, master data — via APIs or agreed exchange formats.
What should I prepare before the first call?
The goal of the site, the type you need (presentation, corporate, online store), the languages you want the site in, the systems it must connect to and the content you already have. The project assessment is free.